Val de Virvée: Power Outage Scheduled for September 26

ENEDIS announces electrical network maintenance that will impact power supply in several areas of the town.

Generic image of electrical network maintenance work.
AI

Generic image of electrical network maintenance work.

Work on the electrical network by ENEDIS will cause a power outage in Val de Virvée on Tuesday, September 26, 2026, between 8:30 AM and 8:45 AM.

The electrical network operator, ENEDIS, has announced maintenance work that is likely to affect the electricity supply in the town of Val de Virvée. These interventions are scheduled for Tuesday, September 26, 2026, and will take place during a short period, from 8:30 AM to 8:45 AM.
Several neighborhoods and hamlets are affected by this temporary interruption. These include, in particular, the following areas:
The DE L EAU DOUCE road (numbers 15, 6 to 16, 20 to 22), the DE FUSERAT road (numbers 5, 9, 13 to 15, 25 to 27, 31, 4, 8 to 26, 30 to 40, 44 to 52, 42B), as well as Fuserat Salignac road (number 33, 14BIS).
The DU SAUVIGNON dead-end street (3 to 5, 4 to 8, 12), the hamlet of LA MERCERIE (5), and the hamlet of FUSERAT (23, 44) are also affected.
Residents of the DE LA MERCERIE road (28, 3, 7, 17, 3, 7 to 13, 17, 21, 25, 29 to 35, 2 to 4, 10 to 14, 22 to 24, 28) and the DE PONTRAPE road (3, 7, 17) will experience an interruption to their electricity supply.
Finally, the hamlet of L EAU DOUCE (4) and the DE NOUGUEREDE road (17 to 21, 37 to 43, 22, 42, 37B) are among the areas where outages are expected.
Based on information from the official source: Mairie de Val de Virvée (28/09/2026)