Pyrénées-Atlantiques: Debris removal on the Nive river in Cambo-les-Bains

The work aims to ensure free water flow and reduce the risk of damage to riverbanks and bridges in the Haurtzain district.

Close-up of debris and branches accumulated against bridge pilings in a river, with clear water flowing around them. The background shows a stone bridge and lush green riverbanks under a bright, clear sky.
AI

Close-up of debris and branches accumulated against bridge pilings in a river, with clear water flowing around them. The background shows a stone bridge and lush green riverbanks under a bright, clear sky.

The Prefect has given approval for the removal of debris in the Haurtzain district of Cambo-les-Bains, on the Nive river, between August 1st and October 15th, 2026.

The Prefect has authorized the DDTM to proceed with the removal of debris from the public river domain (DPF) of the Nive, in the Haurtzain district, between August 1st and October 15th, 2026. This intervention aims to ensure the free flow of water and prevent potential damage to riverbanks and bridge piers.
The work will involve removing debris accumulations deposited on an accretion located upstream of a bridge, within the minor riverbed of the Nive DPF, in the municipality of Cambo-les-Bains.
The file concerning this operation is available for consultation at the town hall.
Based on information from the official source: Mairie de Cambo-les-Bains (29/09/2026)